conference-paper Open access

Bayesian Optimization with Resource Constraints and Production

  • Proceedings of the International Conference on Automated Planning and Scheduling
Research footprint

At a glance

Citations
10
References
27
Comments
0
Paper overview

Abstract

In this paper, we aim to take a step toward a tighter integration of automated planning and Bayesian Optimization (BO). BO is an approach for optimizing costly-to-evaluate functions by selecting a limited number of experiments that each evaluate the function at a specified input. Typical BO formulations assume that experiments are selected one at a time, or in fixed batches, and that experiments can be executed immediately upon request. This setup fails to capture many real-world domains where the execution of an experiment requires setup and preparation time. In this paper, we define a novel BO problem formulation that models the resources and activities needed to prepare and run experiments. We then present a planning approach, based on finite-horizon tree search, for scheduling the potentially concurrent experimental activities with the aim of best optimizing the function within a limited time horizon. A key element of the approach is a novel state evaluation function for evaluating leaves of the search tree, for which we prove approximate guarantees. We evaluate the approach on a number of diverse benchmark problems and show that it produces high-quality results compared to a number of natural baselines.

Record transparency

Publication details

DOI
10.1609/icaps.v26i1.13764
OpenAlex
W2571734310
Document type
conference-paper
Language
EN
Source
Proceedings of the International Conference on Automated Planning and Scheduling
Last metadata update
Community

Comments

Log in to join the discussion.

  1. No comments yet. Start the discussion.