conference-paper

Graph-Augmented Deep Reinforcement Learning for Key Feature Extraction in FJSP

Research footprint

At a glance

Citations
0
References
14
Comments
0
Paper overview

Abstract

The Flexible Job Shop Scheduling Problem (FJSP) represents a significant optimization challenge in modern manufacturing, requiring efficient job allocation and machine selection under complex constraints. Traditional methods struggle to handle high-dimensional state spaces and identify critical features necessary for optimal decision-making, resulting in limitations in performance and stability. We propose a scheduling method based on deep reinforcement learning to extract key features from the state space using Graph Isomorphism Networks (GIN) and the information bottleneck (IB) principle to provide efficient scheduling decisions for FJSP. First, we leverage GIN to model the scheduling environment and capture complex relationships between jobs and machines. Second, we integrate IB to eliminate redundant state information and retain decision-relevant features. Third, we formulate the scheduling process as a Markov Decision Process (MDP) and apply Proximal Strategy Optimization (PPO) for robust policy learning. The experiment results show that the proposed method performs excellently minimizing makespan and ensures stability across different datasets at the same time.

Record transparency

Publication details

DOI
10.23919/ccc64809.2025.11178931
OpenAlex
W4415048811
Document type
conference-paper
Language
EN
Last metadata update
Community

Comments

Log in to join the discussion.

  1. No comments yet. Start the discussion.