article

Pareto-based Multi-criteria Evolutionary Algorithm for a Parallel Machines Scheduling Problem with Sequence-dependent Setup Times

  • International Journal of Engineering
  • Materials and Energy Research Center
Research footprint

At a glance

Citations
4
References
0
Comments
0
Paper overview

Abstract

This paper addresses an unrelated multi-machine scheduling problem with sequence-dependent setup time, release date and processing set restriction to minimize the sum of weighted earliness/tardiness penalties and the sum of completion times, which is known to be NP-hard. A Mixed Integer Programming (MIP) model is proposed to formulate the considered multi-criteria problem. Also, to solve the model for real-sized applications, a Pareto-based algorithm, namely controlled elitism non-dominated sorting genetic algorithm (CENSGA), is proposed. To validate its performance, the algorithm is examined under six performance metric measures, and compared with a Pareto-based algorithm, namely NSGA-II. The results are statistically evaluated by the Mann–Whitney test and t-test methods. From the obtained results based on the t-test, the proposed CENSGA significantly outperforms the NSGA-II in four out of six terms. Additionally, the statistical results from Mann–Whitney test show that the performance of the proposed CENSGA is better than the NSGA- II in two out of six terms. Finally, the experimental results indicate the effectiveness of the proposed algorithm for different problems.

Record transparency

Publication details

DOI
10.5829/ije.2017.30.12c.07
OpenAlex
W2763894117
Document type
article
Language
EN
Source
International Journal of Engineering
Last metadata update
Community

Comments

Log in to join the discussion.

  1. No comments yet. Start the discussion.