Bayesian Optimization with Resource Constraints and Production
At a glance
- Citations
- 10
- References
- 27
- Comments
- 0
Öz
In this paper, we aim to take a step toward a tighter integration of automated planning and Bayesian Optimization (BO). BO is an approach for optimizing costly-to-evaluate functions by selecting a limited number of experiments that each evaluate the function at a specified input. Typical BO formulations assume that experiments are selected one at a time, or in fixed batches, and that experiments can be executed immediately upon request. This setup fails to capture many real-world domains where the execution of an experiment requires setup and preparation time. In this paper, we define a novel BO problem formulation that models the resources and activities needed to prepare and run experiments. We then present a planning approach, based on finite-horizon tree search, for scheduling the potentially concurrent experimental activities with the aim of best optimizing the function within a limited time horizon. A key element of the approach is a novel state evaluation function for evaluating leaves of the search tree, for which we prove approximate guarantees. We evaluate the approach on a number of diverse benchmark problems and show that it produces high-quality results compared to a number of natural baselines.
Publication details
- DOI
- 10.1609/icaps.v26i1.13764
- OpenAlex
- W2571734310
- Document type
- conference-paper
- Language
- EN
- Source
- Proceedings of the International Conference on Automated Planning and Scheduling
- Last metadata update
Comments
Oturum Açın to join the discussion.